Super tall buildings

Commercial Estate

Government education

Public venues

High-end residential

Overseas projects

Chadstone Shopping Center

Location: 1341 Dandenong Rd,Chadstone VIC 3148 Owner: Vicinity Main Contractor: John Holland Architect: BUCHAN Height: 53.32 m Type: Unitized Curtain Wall, Window Wall Façade Qty: 9753 m2                Commencement Date: 2023.9           Completion Time: Under Construction

Chadstone Shopping Center

Melbourne Quarter R2

Location: Flinders Street and Wurundjeri Way section, VIC 3008 Owner: Lend Lease Main Contractor: Lend Lease Architect: Fender Katsalidis Height: 144 m Type: Unitized Curtain Wall, Window Wall, Sliding Door& Baluster Façade Qty: 28141 m2                 Commencement Date: 2024.9           Completion Time: Under Construction

Melbourne Quarter R2

435 Bourke Street

Location: Bourke Street and Queen Street section, VIC 3008 Owner: Cbus Property Pty Ltd Main Contractor: Multiplex Architect: Bates Smart Height: 230.7 m Type: Unitized Curtain Wall Façade Qty: 40721 m2                 Commencement Date: 2024.7            Completion Time: Under Construction

435 Bourke Street

Portal West

Location: London Borough of Ealing, London W3 6RU Owner: City and Dockland Main Contractor: CJ O'shea Architect: BUJ Architects Height: 177m, 66m, 142m, 71m Type: Unitized Curtain Wall, window and door, balcony Façade Qty: 24470.17 m2, 4293.42m2, 19721.83m2, 6917.17m2 Commencement Date: 2019.7 Completion Time: 2022.10

Portal West

Flinders West Tower 1

Location: 8 and 16 Siddeley Street, Docklands VIC 3008 Owner: Mirvac Office Developments Pty Ltd Main Contractor: Mirvac Constructions (Vic) Pty Ltd Architect: Fender Katsalidis Height: 87 m Type: Curved glass curtain wall, window wall, aluminum louver, EBSA automatic hung window system, automatic sliding door, fins Façade Qty: 19102 m2                 Commencement Date: 2024.8             Completion Time: 2025.7

Flinders West Tower 1

Uzbekistan Asian Youth Games Olympic Stadium

Location: Tashkent Uzbekistan Owner: Ministry of Construction of the Republic of Uzbekistan Main Contractor:China CAMC Engineering Co., Ltd. Architect: China IPPR International Engineering Corporation Height: 44.95m,26.2m, 30.75m,19.5m,19.65m,12.75m Type: stick Curtain Wall, aluminum cladding,canopy, louver, etc. Façade Qty: 53659.80 m2 Commencement Date: 2023.7 Completion Time:2024.5

Uzbekistan Asian Youth Games Olympic Stadium

Kingdom of Saudi Arabia Riyadh Airport Concourse H Expansion

Location: Riyadh, KSA Owner: Riyadh Airport Company Builder: Branch of CACC International Engineering Co., Ltd. Architect: HOK Height: 24m Type: Stick glass curtain wall, Skylight, decoration screen Façade Qty: 13,000 m2                  Site Commencement Date: 2024.3          Completion Time: 2024.10

Kingdom of Saudi Arabia Riyadh Airport Concourse H Expansion

One West Point, London, UK

Location: London Borough of Ealing, London W3 6RU Owner: City and Dockland Main Contractor: CJ O'shea Architect: BUJ Architects Height: A Building 215m, B Building 66m, C Building 157m, D Building 75m Type: Unitized curtain wall, GRC, doors and Windows, steel balcony and glass railing, aluminum floor Façade Qty : 55400 m2 Completion Time: 2022.10

One West Point, London, UK

Hanging window system for hidden glass curtain wall

Hanging window system for hidden glass curtain wall

Forward and backward staggered unit curtain wall system

Forward and backward staggered unit curtain wall system

Energy-saving Ete board dry hanging system

Energy-saving Ete board dry hanging system

Pottery curtain wall system connected to cable structure

Pottery curtain wall system connected to cable structure

Point window structure of energy-saving frame curtain wall

Point window structure of energy-saving frame curtain wall

New curved point energy-saving glass curtain wall

New curved point energy-saving glass curtain wall

Glass curtain wall expansion joint system

Glass curtain wall expansion joint system

Energy-saving curtain wall on both sides of the horizontal and vertical keel separation

Energy-saving curtain wall on both sides of the horizontal and vertical keel separation

< 1234...13 >