BIM
Location:
Homepage
/
/
/
Optics Valley International Tennis Center

Optics Valley International Tennis Center

13

13

12

12

  • 产品描述
  •   Platform: Rhino + Grasshopper
      Technical Difficulties:
      The glass curtain wall breaks the norm, and the glass plate is directly connected to the main structure by means of a fixture and a main structure connection. The main structure is a steel structure, and there are large construction errors and unloading deformation errors. In the process of styling optimization, an optimization method combining on-site measurement and genetic algorithm was adopted, and good results were obtained.
      
      Curtain wall area: about 40,000 square meters
      Building height: 42.6 meters
      Time: 2014
      Contract value: 85.85 million yuan
      Curtain wall form: point glass curtain wall, stainless steel ring beam curtain wall
      Project location: Wuhan

Copyright © 2015 Wuhan Lingyun Building Decoration Engineering Co. Ltd     鄂ICP备16023401号-1     Powered by www.300.cn    Link:Lingyun Technology Group Co., Ltd